Our land — Mfou — behind the Mfou Technical High School
5 000 m²titled and subdivided
Titled and subdivided land at Mfou, behind the Technical High School. The area is inhabited and connected to the grid.
6 photos




Details
- Total surface area
- 5 000 m²
- Subdivision
- Titré et loti — lots disponibles à l’unité
- Location
- Mfou — behind the Mfou Technical High School
- Road access
- [distance to the tarred road — to be confirmed]
- Topography
- [To be confirmed after a visit]
- Price
- 10,000 FCFA/m²
- Status
- Available
Locate the land
The precise location of the land is reserved for people who receive the file.
Legal status
- Type of title
- Titled and subdivided land
- Land title
- Number given with the file
- Subdivision
- Approved subdivision plan (given with the file)
- Notary
- Appointed for the signing — stated in the parcel’s file
You may have these references checked by your own notary, at your expense, before paying anything. We recommend it.
The file you receive
- Copy of the land title
- Location plan
- Subdivision plan (number and surface area of each plot)
- Planning status
- Draft notarised deed
- Payment schedule
Access and surroundings
Access
[distance to the tarred road — to be confirmed]
Housing
Already a residential area
Electricity
Connected to the electricity grid
Water
[mains or borehole — to be confirmed plot by plot]
School / market
[landmarks — to be confirmed]
What this parcel lacks
- We would rather tell you here than during the visit.
- [Water supply: to be confirmed plot by plot (borehole or mains)]
- [Access work may be needed in the rainy season, where applicable]
Payment
Options
Outright, or in instalments over a set term once your file has been studied.
Accepted methods
MTN MoMo and Orange Money (merchant number in the company’s name), bank transfer, international transfer.
Traceability
A numbered receipt for every payment. No payment into a personal account.
Before reservation
The terms, the duration and the amounts are set in writing and signed before any reservation.
How buying works
01
You write to us
WhatsApp, a call or the form. Reply in under 15 minutes during the day.
02
You receive the file
Title, subdivision plan, location plan, planning status, and your payment proposal.
03
You visit
On site with an adviser. No obligation.
04
You sign
Deed before a notary, then support through to the transfer of the title.
Interested in this parcel
Get the complete file
Thank you. Your request is going to WhatsApp: reply in under 15 minutes during the day.